A smooth pool delivery depends on work completed before the truck arrives. The base, access route, lifting plan and responsible people should already be agreed. Treat delivery, placement and commissioning as three separate milestones, each with a short acceptance check.
Before dispatch
Confirm the final approved model, orientation and equipment list. Make sure the installer has the manufacturer’s current foundation and installation requirements, not an early sales sketch.
The site team should check the prepared levels and support arrangement. The transport and lifting teams need the actual shipment dimensions, weight and approved lifting points. Agree who can authorize a delay if weather, access or the base is unsuitable. Having a truck on site is not a reason to proceed with an unsafe or incorrect placement.

On arrival
Check the unit and loose packages against the packing list. Photograph visible damage before unloading where it is safe to do so, and record anything that needs inspection after wrapping is removed. Follow the delivery contract’s damage-reporting procedure.
Check the orientation again before the lift. An equipment door or window facing the wrong direction can be difficult to correct once connections and finishes are installed. Only the lifting team should direct the load; the owner can verify the agreed position without entering the lifting area.

After placement and before covering work
The installer should confirm level, support and required clearances. For an inground shell, filling and backfilling must follow that manufacturer’s sequence. Do not improvise one sequence for every prefabricated pool type.
Have pipework tested at the appropriate stage and record routes before they are buried or hidden. Photograph accessible joints, buried lines and equipment connections. Those records can save unnecessary digging if a repair is needed later.
At commissioning
A placed pool is not yet a commissioned pool. The team should demonstrate normal circulation, check for visible leaks, test supplied features and explain the controls. Electrical checks and required inspections must be completed by the appropriate local professionals.
Ask the person handing over the system to show you:
- The normal water level and how to check water quality.
- The pump schedule and normal filter reading.
- How to stop the system and isolate equipment safely.
- The cleaning routine and approved tools.
- What to do before cold weather or a long absence.
Close out the outstanding items
Write down missing parts, defects and unfinished work with a responsible contact and target date. Keep manuals, test records, model details and warranty documents in one folder. A signed delivery note should not silently replace the separate agreement for completing installation.
For your Kaixin Pools order, we can discuss the supplied configuration and information your local installer will need. Confirm those details early so the factory delivery and site work can meet at the same clear handover points.
Pool FAQs
Can KAIXIN provide drawings for a pool project?
KAIXIN can provide product dimension drawings, structural and foundation information, and equipment layouts as supporting documents for your project.
What design and installation support can KAIXIN provide?
KAIXIN can provide 3D renderings, technical consultation and installation guidance to help you plan your pool project.
Can KAIXIN help plan my pool layout?
Yes. KAIXIN can help plan the pool location, equipment room, pipe routing and how the pool fits into the surrounding landscape.